Marina B Managed Aquatic Plant Systems Under Contract
The City of Titusville will install managed aquatic plant systems (MAPS) within a 1-acre City owned pond located within the Marina Park. The will cover 5% of the pond surface. These islands will incorporate dissolved nutrients from the water column into plant as the plants grow. and the plants will be harvested from the pond annually, thereby removing an estimated 55 pounds of nitrogen and 7 pounds of phosphorous from the Indian River Lagoon annually.